After sizing calculation, it was proposed to install a GC QUATTRO unit in each return of each air handler. Because one of the owners was an HVAC contractor, the installation was a pretty simple task. Low maintenance of the units was also considered. In between production, the rooms were cleaned thoroughly, and the fans blades disinfected from all the dust settlings.